Triple
T22924946
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Thomas Viaduct |
E569276
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | multiple-arch bridge |
C39447
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: multiple-arch bridge Context triple: [Thomas Viaduct, instanceOf, multiple-arch bridge]
-
A.
multi-arch bridge
chosen
A multi-arch bridge is a structure that spans a distance using a series of connected arches to distribute loads efficiently across multiple supports.
-
B.
through-arch bridge
A through-arch bridge is a type of arch bridge in which the deck passes between the arches, with the arch ribs rising above the roadway and connected by vertical or diagonal hangers that support the deck.
-
C.
multipurpose bridge
A multipurpose bridge is a structural crossing designed to support multiple concurrent uses—such as vehicular traffic, pedestrians, cyclists, utilities, and sometimes public spaces or transit systems—within a single integrated infrastructure.
-
D.
multi-span bridge
A multi-span bridge is a bridge structure composed of multiple consecutive spans supported by intermediate piers or supports, allowing it to cross longer distances or multiple obstacles.
-
E.
bridge approach
A bridge approach is the section of roadway that transitions between the ground and the main span of a bridge, providing a smooth and stable connection for vehicles and pedestrians.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2458f7d008190901dccbaebeaba24 |
completed | April 17, 2026, 2:37 p.m. |
Created at: April 17, 2026, 3:43 p.m.