Triple
T22924577
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Potts Camp, Mississippi |
E569265
|
entity |
| Predicate | transportationAccess |
P941
|
FINISHED |
| Object | U.S. Route 78 vicinity |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 78 vicinity | Statement: [Potts Camp, Mississippi, transportationAccess, U.S. Route 78 vicinity]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: U.S. Route 78 vicinity Context triple: [Potts Camp, Mississippi, transportationAccess, U.S. Route 78 vicinity]
-
A.
Interstate 20 vicinity
The Interstate 20 vicinity is the area surrounding the major east–west Interstate 20 highway corridor near Flowood, Mississippi, serving as a key route for regional travel and commerce.
-
B.
U.S. Route 50 corridor vicinity
The U.S. Route 50 corridor vicinity is a transportation and development belt running along U.S. Route 50 through the Virginia Range area, serving as a key east–west travel and access route.
-
C.
U.S. Route 80 nearby
U.S. Route 80 is a major east–west U.S. Highway that serves as an important regional transportation corridor near Upatoi, Georgia.
-
D.
U.S. Route 56 nearby
U.S. Route 56 is a U.S. highway running generally east–west across the central United States, connecting several Midwestern and Great Plains states.
-
E.
U.S. Route 62 nearby
U.S. Route 62 is a major east–west United States highway that stretches from the Mexican border in Texas to the Canadian border in New York, passing through multiple states including Kentucky.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: U.S. Route 78 vicinity Target entity description: U.S. Route 78 vicinity refers to the area surrounding the major east–west U.S. highway that runs through the northern part of Mississippi and connects several Southern states.
-
A.
Interstate 20 vicinity
The Interstate 20 vicinity is the area surrounding the major east–west Interstate 20 highway corridor near Flowood, Mississippi, serving as a key route for regional travel and commerce.
-
B.
U.S. Route 50 corridor vicinity
The U.S. Route 50 corridor vicinity is a transportation and development belt running along U.S. Route 50 through the Virginia Range area, serving as a key east–west travel and access route.
-
C.
U.S. Route 80 nearby
U.S. Route 80 is a major east–west U.S. Highway that serves as an important regional transportation corridor near Upatoi, Georgia.
-
D.
U.S. Route 56 nearby
U.S. Route 56 is a U.S. highway running generally east–west across the central United States, connecting several Midwestern and Great Plains states.
-
E.
U.S. Route 62 nearby
U.S. Route 62 is a major east–west United States highway that stretches from the Mexican border in Texas to the Canadian border in New York, passing through multiple states including Kentucky.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2458f7d008190901dccbaebeaba24 |
completed | April 17, 2026, 2:37 p.m. |
| NER | Named-entity recognition | batch_69f180d84fc08190b747c3f9052c657a |
completed | April 29, 2026, 3:54 a.m. |
Created at: April 17, 2026, 3:43 p.m.