Triple
T22923740
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nova Scotia Highway 102 |
E569235
|
entity |
| Predicate | connectsTo |
P845
|
FINISHED |
| Object | Highway 102 Airport Connector |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Highway 102 Airport Connector | Statement: [Nova Scotia Highway 102, connectsTo, Highway 102 Airport Connector]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Highway 102 Airport Connector Context triple: [Nova Scotia Highway 102, connectsTo, Highway 102 Airport Connector]
-
A.
State Highway 121 Tollway
State Highway 121 Tollway, now known as the Sam Rayburn Tollway, is a major toll road in the northern Dallas–Fort Worth area of Texas that serves as a key east–west transportation corridor.
-
B.
Red Mountain Expressway
Red Mountain Expressway is a major highway route in Birmingham, Alabama, that cuts through Red Mountain to connect the city’s southern suburbs with its downtown area.
-
C.
East–West Connector
The East–West Connector is a state highway in Frankfort, Kentucky, that provides a major east–west route linking key local roads and improving traffic flow around the city.
-
D.
Highway 410
Highway 410 is a major controlled-access freeway in Ontario, Canada, that connects the city of Mississauga to Brampton and links to other key routes in the Greater Toronto Area.
-
E.
Kingery Expressway
Kingery Expressway is a major freeway in northeastern Illinois that serves as a key connector for regional and interstate traffic in the Chicago metropolitan area.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Highway 102 Airport Connector Target entity description: Highway 102 Airport Connector is a short access route in Nova Scotia that links Highway 102 to Halifax Stanfield International Airport.
-
A.
State Highway 121 Tollway
State Highway 121 Tollway, now known as the Sam Rayburn Tollway, is a major toll road in the northern Dallas–Fort Worth area of Texas that serves as a key east–west transportation corridor.
-
B.
Red Mountain Expressway
Red Mountain Expressway is a major highway route in Birmingham, Alabama, that cuts through Red Mountain to connect the city’s southern suburbs with its downtown area.
-
C.
East–West Connector
The East–West Connector is a state highway in Frankfort, Kentucky, that provides a major east–west route linking key local roads and improving traffic flow around the city.
-
D.
Highway 410
Highway 410 is a major controlled-access freeway in Ontario, Canada, that connects the city of Mississauga to Brampton and links to other key routes in the Greater Toronto Area.
-
E.
Kingery Expressway
Kingery Expressway is a major freeway in northeastern Illinois that serves as a key connector for regional and interstate traffic in the Chicago metropolitan area.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2458f7d008190901dccbaebeaba24 |
completed | April 17, 2026, 2:37 p.m. |
| NER | Named-entity recognition | batch_69f180d7973c8190b09a5690fd1d3f28 |
completed | April 29, 2026, 3:53 a.m. |
Created at: April 17, 2026, 3:43 p.m.