Triple
T22920228
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Poseidon (Europa-Park) |
E568839
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | hybrid water coaster |
C4775
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: hybrid water coaster Context triple: [Poseidon (Europa-Park), instanceOf, hybrid water coaster]
-
A.
hybrid dark ride roller coaster
A hybrid dark ride roller coaster is an attraction that combines immersive, story-driven indoor dark ride elements with the high-speed thrills and track features of a traditional roller coaster.
-
B.
Bolliger & Mabillard roller coaster
A Bolliger & Mabillard roller coaster is a high-quality, steel amusement ride engineered by the Swiss firm B&M, known for its smoothness, reliability, and innovative track and train designs across multiple coaster types.
-
C.
roller coaster variant
chosen
A roller coaster variant is a specific type or design of roller coaster that differs in track layout, ride mechanics, theming, or rider experience from standard models.
-
D.
launched roller coaster
A launched roller coaster is a type of roller coaster that uses propulsion systems such as linear motors, hydraulic launches, or compressed air to rapidly accelerate trains to high speeds without relying on a traditional lift hill.
-
E.
roller coaster
A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2458d90c88190a58cead4e781ca6a |
completed | April 17, 2026, 2:37 p.m. |
Created at: April 17, 2026, 3:42 p.m.