Triple

T22920228
Position Surface form Disambiguated ID Type / Status
Subject Poseidon (Europa-Park) E568839 entity
Predicate instanceOf P0 FINISHED
Object hybrid water coaster C4775 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hybrid water coaster
Context triple: [Poseidon (Europa-Park), instanceOf, hybrid water coaster]
  • A. hybrid dark ride roller coaster
    A hybrid dark ride roller coaster is an attraction that combines immersive, story-driven indoor dark ride elements with the high-speed thrills and track features of a traditional roller coaster.
  • B. Bolliger & Mabillard roller coaster
    A Bolliger & Mabillard roller coaster is a high-quality, steel amusement ride engineered by the Swiss firm B&M, known for its smoothness, reliability, and innovative track and train designs across multiple coaster types.
  • C. roller coaster variant chosen
    A roller coaster variant is a specific type or design of roller coaster that differs in track layout, ride mechanics, theming, or rider experience from standard models.
  • D. launched roller coaster
    A launched roller coaster is a type of roller coaster that uses propulsion systems such as linear motors, hydraulic launches, or compressed air to rapidly accelerate trains to high speeds without relying on a traditional lift hill.
  • E. roller coaster
    A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2458d90c88190a58cead4e781ca6a completed April 17, 2026, 2:37 p.m.
Created at: April 17, 2026, 3:42 p.m.