Triple

T22920041
Position Surface form Disambiguated ID Type / Status
Subject Arthur – The Ride E568835 entity
Predicate instanceOf P0 FINISHED
Object indoor/outdoor roller coaster C4665 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: indoor/outdoor roller coaster
Context triple: [Arthur – The Ride, instanceOf, indoor/outdoor roller coaster]
  • A. indoor roller coaster chosen
    An indoor roller coaster is an amusement ride featuring a track-based, high-speed vehicle system enclosed within a building, often enhanced with controlled lighting, sound, and themed environments.
  • B. stand-up roller coaster
    A stand-up roller coaster is a type of thrill ride where passengers remain standing in specially designed restraints as the train traverses a track with drops, turns, and inversions.
  • C. indoor ride
    An indoor ride is an amusement attraction located within an enclosed structure that uses controlled environments, lighting, and special effects to create an immersive ride experience.
  • D. Bolliger & Mabillard roller coaster
    A Bolliger & Mabillard roller coaster is a high-quality, steel amusement ride engineered by the Swiss firm B&M, known for its smoothness, reliability, and innovative track and train designs across multiple coaster types.
  • E. inverted roller coaster
    An inverted roller coaster is a type of roller coaster where the train travels beneath the track with riders’ legs dangling freely, creating intense, suspended-feeling maneuvers and inversions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2458d90c88190a58cead4e781ca6a completed April 17, 2026, 2:37 p.m.
Created at: April 17, 2026, 3:42 p.m.