Triple
T22906023
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Newlands Reclamation Project |
E568445
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | reclamation project |
C46999
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: reclamation project Context triple: [Newlands Reclamation Project, instanceOf, reclamation project]
-
A.
reclamation project service area
A reclamation project service area is the defined geographic region within which a reclamation project provides water delivery, drainage, and related services to support agricultural, municipal, or environmental uses.
-
B.
component of a reclamation project
A component of a reclamation project is an individual physical, technical, or administrative element—such as infrastructure, process, or resource—that contributes to restoring, improving, or repurposing land, water, or other environmental assets.
-
C.
land reclamation campaign
A land reclamation campaign is a coordinated effort, typically led by governments or organizations, to convert unusable or degraded land—such as wetlands, deserts, or polluted areas—into productive land for agriculture, industry, housing, or environmental restoration.
-
D.
proposed dam project
A proposed dam project is a planned infrastructure initiative to construct a barrier across a waterway for purposes such as water storage, flood control, energy generation, or irrigation, pending approval and implementation.
-
E.
landfill reclamation project
A landfill reclamation project is an organized effort to excavate, process, and remediate an existing landfill site to recover usable materials, restore environmental quality, and enable safe future land use.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2458cd9e48190943ad2e34485d939 |
completed | April 17, 2026, 2:37 p.m. |
Created at: April 17, 2026, 3:41 p.m.