Triple

T22906023
Position Surface form Disambiguated ID Type / Status
Subject Newlands Reclamation Project E568445 entity
Predicate instanceOf P0 FINISHED
Object reclamation project C46999 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: reclamation project
Context triple: [Newlands Reclamation Project, instanceOf, reclamation project]
  • A. reclamation project service area
    A reclamation project service area is the defined geographic region within which a reclamation project provides water delivery, drainage, and related services to support agricultural, municipal, or environmental uses.
  • B. component of a reclamation project
    A component of a reclamation project is an individual physical, technical, or administrative element—such as infrastructure, process, or resource—that contributes to restoring, improving, or repurposing land, water, or other environmental assets.
  • C. land reclamation campaign
    A land reclamation campaign is a coordinated effort, typically led by governments or organizations, to convert unusable or degraded land—such as wetlands, deserts, or polluted areas—into productive land for agriculture, industry, housing, or environmental restoration.
  • D. proposed dam project
    A proposed dam project is a planned infrastructure initiative to construct a barrier across a waterway for purposes such as water storage, flood control, energy generation, or irrigation, pending approval and implementation.
  • E. landfill reclamation project
    A landfill reclamation project is an organized effort to excavate, process, and remediate an existing landfill site to recover usable materials, restore environmental quality, and enable safe future land use.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2458cd9e48190943ad2e34485d939 completed April 17, 2026, 2:37 p.m.
Created at: April 17, 2026, 3:41 p.m.