Triple
T2287397
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Der Gedanke |
E51424
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | work on philosophy of language |
C3340
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: work on philosophy of language Context triple: [Der Gedanke, instanceOf, work on philosophy of language]
-
A.
linguistic work
chosen
A linguistic work is a created artifact—such as a text, speech, or signed performance—whose primary purpose is to convey meaning through a structured natural or formal language.
-
B.
linguistic theory
Linguistic theory is the systematic study and modeling of the structure, use, and acquisition of language, aiming to explain how languages are organized, processed, and understood.
-
C.
philosophy of mathematics work
A philosophy of mathematics work is a scholarly text that critically examines the nature, foundations, methods, and implications of mathematics from a philosophical perspective.
-
D.
analytic philosopher
An analytic philosopher is a thinker who approaches philosophical problems through precise argumentation, logical analysis, and careful examination of language and concepts.
-
E.
linguist
A linguist is a specialist who systematically studies language structure, use, and development across different contexts and communities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88b09c644819090b503456d96bf70 |
completed | March 4, 2026, 7:42 p.m. |
Created at: March 4, 2026, 7:48 p.m.