Triple
T22866052
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Epsom Common Pond |
E567056
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | natural water feature |
C11291
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: natural water feature Context triple: [Epsom Common Pond, instanceOf, natural water feature]
-
A.
waterway feature
A waterway feature is any natural or man-made linear or areal element that involves the presence, movement, or containment of water, such as rivers, canals, streams, or channels.
-
B.
outdoor fountain
An outdoor fountain is a decorative water feature installed in exterior spaces that circulates or sprays water for aesthetic, ambient, or architectural enhancement.
-
C.
recreational water body
chosen
A recreational water body is a natural or artificial water feature, such as a lake, pond, pool, or shoreline area, specifically used for leisure activities like swimming, boating, fishing, or relaxation.
-
D.
natural spring complex
A natural spring complex is a geographically clustered system of groundwater discharge points and associated surface features, such as pools, streams, and wetlands, formed where subsurface water naturally emerges at the Earth’s surface.
-
E.
man-made waterfall
A man-made waterfall is an artificial structure designed to mimic the appearance and flow of a natural waterfall, typically created for aesthetic, recreational, or environmental purposes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e24589083081908d5694c4fdc80086 |
completed | April 17, 2026, 2:36 p.m. |
Created at: April 17, 2026, 3:38 p.m.