Triple

T2285063
Position Surface form Disambiguated ID Type / Status
Subject Tesla Supercharger network E51369 entity
Predicate instanceOf P0 FINISHED
Object fast charging network C9497 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: fast charging network
Context triple: [Tesla Supercharger network, instanceOf, fast charging network]
  • A. fast day
    A fast day is a designated period, often in religious or spiritual traditions, during which individuals abstain from some or all food and sometimes drink for purposes such as devotion, repentance, or reflection.
  • B. transport infrastructure network
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • C. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • D. rapid transit line segment
    A rapid transit line segment is a contiguous portion of a rapid transit route between two defined points (such as stations, junctions, or terminals) that carries high-frequency, high-capacity passenger rail service.
  • E. city network
    A city network is an interconnected system of urban areas linked by transportation, communication, and economic relationships that facilitate the flow of people, goods, information, and services.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88b08e4308190bdac9aebcca1c91a completed March 4, 2026, 7:42 p.m.
Created at: March 4, 2026, 7:48 p.m.