Triple
T22813039
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ISO/IEC JTC 1/SC 7 |
E565032
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | software and systems engineering standards body |
C3871
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: software and systems engineering standards body Context triple: [ISO/IEC JTC 1/SC 7, instanceOf, software and systems engineering standards body]
-
A.
technical standards body
A technical standards body is an organization that develops, maintains, and promotes agreed-upon technical specifications and protocols to ensure interoperability, safety, and consistency across industries and technologies.
-
B.
standards oversight body
A standards oversight body is an organization responsible for developing, maintaining, and enforcing technical or procedural standards to ensure consistency, quality, and interoperability across a domain.
-
C.
software standard
A software standard is an agreed-upon set of rules, formats, and practices that ensures compatibility, interoperability, and quality across different software systems and components.
-
D.
software review and audit standard
A software review and audit standard is a formalized set of criteria, processes, and guidelines used to systematically evaluate software products and development practices for quality, compliance, security, and reliability.
-
E.
standards-setting organization
chosen
A standards-setting organization is an entity that develops, maintains, and promotes agreed-upon technical, professional, or procedural norms to ensure compatibility, quality, and interoperability across industries or sectors.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2458426188190b58b8ab4844fe420 |
completed | April 17, 2026, 2:36 p.m. |
Created at: April 17, 2026, 3:32 p.m.