Triple
T22811784
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Morrison-Bachy Soletanche Joint Venture |
E564697
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | civil engineering consortium |
C36946
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: civil engineering consortium Context triple: [Morrison-Bachy Soletanche Joint Venture, instanceOf, civil engineering consortium]
-
A.
civil engineering support organization
chosen
A civil engineering support organization is an entity that provides specialized technical, logistical, administrative, and project management services to assist civil engineers and infrastructure projects throughout their lifecycle.
-
B.
group of civil engineers
A group of civil engineers is a collaborative team of professionals who plan, design, and oversee the construction and maintenance of infrastructure projects such as roads, bridges, buildings, and water systems.
-
C.
corps of engineers
A corps of engineers is an organized body of military or civilian engineers responsible for planning, designing, constructing, and maintaining infrastructure and technical projects, often in support of national defense or public works.
-
D.
civil engineer
A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
-
E.
civil and environmental engineering department
A civil and environmental engineering department is an academic unit that educates students and conducts research on the planning, design, construction, and management of infrastructure and environmental systems to support sustainable and resilient communities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245823f4c8190ade442cdcc2c224a |
completed | April 17, 2026, 2:36 p.m. |
Created at: April 17, 2026, 3:32 p.m.