Triple

T22799348
Position Surface form Disambiguated ID Type / Status
Subject The Titanic (Dresdner Bank project collage) E564341 entity
Predicate commissionedFor P1576 FINISHED
Object Dresdner Bank project NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Dresdner Bank project | Statement: [The Titanic (Dresdner Bank project collage), commissionedFor, Dresdner Bank project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Dresdner Bank project
Context triple: [The Titanic (Dresdner Bank project collage), commissionedFor, Dresdner Bank project]
  • A. Association of German Banks
    The Association of German Banks is the leading industry body representing private commercial banks in Germany, coordinating their interests in financial regulation, policy, and banking standards.
  • B. Stuttgart 21
    Stuttgart 21 is a large and controversial German rail and urban development project that involves transforming Stuttgart’s main train station into an underground through-station and redesigning the surrounding city area.
  • C. DZ Bank
    DZ Bank is a major German cooperative central bank that serves as the central institution for numerous cooperative banks and financial services providers across Germany.
  • D. Millennium Link project
    The Millennium Link project was a major Scottish engineering and regeneration initiative that restored and reconnected the Forth & Clyde and Union Canals to create a continuous navigable waterway between Glasgow and Edinburgh.
  • E. Königsberger Bank
    Königsberger Bank was a historic German financial institution based in Königsberg that played a key role in regional banking and early 20th-century commercial development.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Dresdner Bank project
Target entity description: The Dresdner Bank project was a corporate art and design initiative by the German bank Dresdner Bank that commissioned works such as the collage "The Titanic (Dresdner Bank project)" for branding, cultural, or promotional purposes.
  • A. Association of German Banks
    The Association of German Banks is the leading industry body representing private commercial banks in Germany, coordinating their interests in financial regulation, policy, and banking standards.
  • B. Stuttgart 21
    Stuttgart 21 is a large and controversial German rail and urban development project that involves transforming Stuttgart’s main train station into an underground through-station and redesigning the surrounding city area.
  • C. DZ Bank
    DZ Bank is a major German cooperative central bank that serves as the central institution for numerous cooperative banks and financial services providers across Germany.
  • D. Millennium Link project
    The Millennium Link project was a major Scottish engineering and regeneration initiative that restored and reconnected the Forth & Clyde and Union Canals to create a continuous navigable waterway between Glasgow and Edinburgh.
  • E. Königsberger Bank
    Königsberger Bank was a historic German financial institution based in Königsberg that played a key role in regional banking and early 20th-century commercial development.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2458185f88190b0045227ee420411 completed April 17, 2026, 2:36 p.m.
NER Named-entity recognition batch_69f17cdb6ba48190936bd356704c1241 completed April 29, 2026, 3:36 a.m.
Created at: April 17, 2026, 3:31 p.m.