Triple

T22775758
Position Surface form Disambiguated ID Type / Status
Subject São Simão Dam E563692 entity
Predicate formsReservoir P11309 FINISHED
Object São Simão Reservoir NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: São Simão Reservoir | Statement: [São Simão Dam, formsReservoir, São Simão Reservoir]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: São Simão Reservoir
Context triple: [São Simão Dam, formsReservoir, São Simão Reservoir]
  • A. Guarapiranga Reservoir
    Guarapiranga Reservoir is a large artificial lake in the southern part of São Paulo, Brazil, serving as an important source of water supply and a popular site for recreation and water sports.
  • B. Barra Bonita Reservoir
    Barra Bonita Reservoir is an artificial lake in the state of São Paulo, Brazil, created for hydroelectric power generation, navigation, and water regulation along the Tietê River.
  • C. Jurumirim Reservoir
    Jurumirim Reservoir is a large artificial lake in the state of São Paulo, Brazil, known for hydroelectric power generation, water regulation, and recreational activities.
  • D. São Simão Dam
    São Simão Dam is a large hydroelectric power facility in Brazil known for generating electricity and forming the São Simão Reservoir on the Paranaíba River.
  • E. Cabril Reservoir
    Cabril Reservoir is a major artificial lake in central Portugal, created by a dam on the Zêzere River and used for hydroelectric power generation, water storage, and recreation.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: São Simão Reservoir
Target entity description: São Simão Reservoir is a large artificial lake in Brazil created for hydroelectric power generation and water regulation.
  • A. Guarapiranga Reservoir
    Guarapiranga Reservoir is a large artificial lake in the southern part of São Paulo, Brazil, serving as an important source of water supply and a popular site for recreation and water sports.
  • B. Barra Bonita Reservoir
    Barra Bonita Reservoir is an artificial lake in the state of São Paulo, Brazil, created for hydroelectric power generation, navigation, and water regulation along the Tietê River.
  • C. Jurumirim Reservoir
    Jurumirim Reservoir is a large artificial lake in the state of São Paulo, Brazil, known for hydroelectric power generation, water regulation, and recreational activities.
  • D. São Simão Dam chosen
    São Simão Dam is a large hydroelectric power facility in Brazil known for generating electricity and forming the São Simão Reservoir on the Paranaíba River.
  • E. Cabril Reservoir
    Cabril Reservoir is a major artificial lake in central Portugal, created by a dam on the Zêzere River and used for hydroelectric power generation, water storage, and recreation.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24554497c819080b996e071de27c2 completed April 17, 2026, 2:36 p.m.
NER Named-entity recognition batch_69f17b61acf881909d9f54e0966ee3cc completed April 29, 2026, 3:30 a.m.
Created at: April 17, 2026, 3:28 p.m.