Triple

T22719821
Position Surface form Disambiguated ID Type / Status
Subject Ejisu E561829 entity
Predicate roadConnection P385 FINISHED
Object Kumasi–Accra highway NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kumasi–Accra highway | Statement: [Ejisu, roadConnection, Kumasi–Accra highway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kumasi–Accra highway
Context triple: [Ejisu, roadConnection, Kumasi–Accra highway]
  • A. Accra–Akosombo road
    The Accra–Akosombo road is a major highway in Ghana that connects the capital city Accra with the town of Akosombo near the Volta River and Lake Volta.
  • B. Accra–Cape Coast highway
    The Accra–Cape Coast highway is a major roadway in southern Ghana that links the capital city Accra with the historic coastal city of Cape Coast, serving as a key corridor for travel and trade.
  • C. Wa–Kumasi road
    The Wa–Kumasi road is a major transport route in Ghana that links the northern town of Wa with the southern city of Kumasi, facilitating regional trade and travel.
  • D. Accra-Tema motorway
    The Accra–Tema Motorway is a major dual carriageway in Ghana that serves as a key transport corridor linking the capital city Accra with the industrial and port city of Tema.
  • E. Accra–Tema Beach Road
    The Accra–Tema Beach Road is a coastal highway in Ghana that connects the capital city Accra with the port and industrial city of Tema along the Gulf of Guinea.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Kumasi–Accra highway
Target entity description: The Kumasi–Accra highway is a major arterial road in Ghana that links the inland city of Kumasi with the coastal capital, Accra, serving as a key route for commerce and travel between the two regions.
  • A. Accra–Akosombo road
    The Accra–Akosombo road is a major highway in Ghana that connects the capital city Accra with the town of Akosombo near the Volta River and Lake Volta.
  • B. Accra–Cape Coast highway
    The Accra–Cape Coast highway is a major roadway in southern Ghana that links the capital city Accra with the historic coastal city of Cape Coast, serving as a key corridor for travel and trade.
  • C. Wa–Kumasi road
    The Wa–Kumasi road is a major transport route in Ghana that links the northern town of Wa with the southern city of Kumasi, facilitating regional trade and travel.
  • D. Accra-Tema motorway
    The Accra–Tema Motorway is a major dual carriageway in Ghana that serves as a key transport corridor linking the capital city Accra with the industrial and port city of Tema.
  • E. Accra–Tema Beach Road
    The Accra–Tema Beach Road is a coastal highway in Ghana that connects the capital city Accra with the port and industrial city of Tema along the Gulf of Guinea.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2454fc984819088213b58ee87a002 completed April 17, 2026, 2:35 p.m.
NER Named-entity recognition batch_69f17910deb48190b38174e16868f3dd completed April 29, 2026, 3:20 a.m.
Created at: April 17, 2026, 3:19 p.m.