Triple

T22717892
Position Surface form Disambiguated ID Type / Status
Subject Legrand E561782 entity
Predicate instanceOf P0 FINISHED
Object electrical equipment company C136 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electrical equipment company
Context triple: [Legrand, instanceOf, electrical equipment company]
  • A. utilities company
    A utilities company is an organization that provides essential public services such as electricity, gas, water, or telecommunications to residential, commercial, and industrial customers, typically under government regulation.
  • B. public utility company
    A public utility company is an organization, often government-regulated, that provides essential services such as electricity, water, gas, or telecommunications to the public, typically operating as a natural monopoly to ensure reliable and widespread access.
  • C. manufacturing company chosen
    A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
  • D. industrial automation company
    An industrial automation company designs, develops, and implements control systems, robotics, and software solutions to optimize and automate manufacturing and industrial processes.
  • E. energy infrastructure company
    An energy infrastructure company develops, owns, and operates the physical assets and networks that produce, transport, store, and deliver energy resources and power to end users.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2454fc984819088213b58ee87a002 completed April 17, 2026, 2:35 p.m.
Created at: April 17, 2026, 3:19 p.m.