Triple

T22712650
Position Surface form Disambiguated ID Type / Status
Subject West Midlands Trains rolling stock E561641 entity
Predicate electrificationSystemCompatibleWith P5320 FINISHED
Object 25 kV AC overhead line LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 25 kV AC overhead line | Statement: [West Midlands Trains rolling stock, electrificationSystemCompatibleWith, 25 kV AC overhead line]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electrificationSystemCompatibleWith
Context triple: [West Midlands Trains rolling stock, electrificationSystemCompatibleWith, 25 kV AC overhead line]
  • A. electrificationCompatibility
    Indicates whether one entity can be effectively and safely powered, charged, or operated using the electrical system, standards, or infrastructure associated with another entity.
  • B. electrificationSystem chosen
    Indicates the type of electrical power system used to supply energy (typically to infrastructure or vehicles) for operation.
  • C. electrificationUsedBy
    Indicates that a particular electrification system, method, or technology is employed or utilized by a given entity.
  • D. electrificationUsedFor
    Indicates that electrification is employed as a means or method to achieve, enable, or support a particular function, process, or purpose.
  • E. hasElectrificationStatus
    Indicates that an entity possesses a specified type or level of electrification (e.g., electrified, non-electrified, partially electrified).
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2454f1348819088d83f420925a5c1 completed April 17, 2026, 2:35 p.m.
NER Named-entity recognition batch_69f1790ab6208190a342f076002324ab completed April 29, 2026, 3:20 a.m.
PD Predicate disambiguation batch_69ee62bd657c81909f7b01245b080a5f completed April 26, 2026, 7:08 p.m.
Created at: April 17, 2026, 3:18 p.m.