Triple
T22712254
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Swiss east–west rail axis |
E561632
|
entity |
| Predicate | hasPart |
P35
|
FINISHED |
| Object | St. Gallen–St. Margrethen railway line |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: St. Gallen–St. Margrethen railway line | Statement: [Swiss east–west rail axis, hasPart, St. Gallen–St. Margrethen railway line]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: St. Gallen–St. Margrethen railway line Context triple: [Swiss east–west rail axis, hasPart, St. Gallen–St. Margrethen railway line]
-
A.
Basel–Lucerne railway line
The Basel–Lucerne railway line is a key Swiss rail route connecting the cities of Basel and Lucerne through the Swiss Plateau, serving both regional and long-distance passenger traffic.
-
B.
Basel–Delémont railway line
The Basel–Delémont railway line is a Swiss standard-gauge rail route connecting the city of Basel with Delémont through the Jura region, serving both regional and intercity traffic.
-
C.
Bern–Lucerne railway line
The Bern–Lucerne railway line is a major Swiss rail route connecting the capital city of Bern with the central Swiss city of Lucerne, serving as an important corridor for both regional and intercity passenger traffic.
-
D.
Basel–Biel/Bienne railway line
The Basel–Biel/Bienne railway line is a major Swiss rail route connecting the city of Basel with Biel/Bienne, serving as an important corridor for both regional and long-distance passenger and freight traffic.
-
E.
Zürich–Sargans railway
The Zürich–Sargans railway is a major Swiss rail line connecting the city of Zürich with the eastern Swiss town of Sargans, forming part of an important national and international transit corridor.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: St. Gallen–St. Margrethen railway line Target entity description: The St. Gallen–St. Margrethen railway line is a key standard-gauge route in northeastern Switzerland that connects the city of St. Gallen with the Rhine Valley and international links toward Austria.
-
A.
Basel–Lucerne railway line
The Basel–Lucerne railway line is a key Swiss rail route connecting the cities of Basel and Lucerne through the Swiss Plateau, serving both regional and long-distance passenger traffic.
-
B.
Basel–Delémont railway line
The Basel–Delémont railway line is a Swiss standard-gauge rail route connecting the city of Basel with Delémont through the Jura region, serving both regional and intercity traffic.
-
C.
Bern–Lucerne railway line
The Bern–Lucerne railway line is a major Swiss rail route connecting the capital city of Bern with the central Swiss city of Lucerne, serving as an important corridor for both regional and intercity passenger traffic.
-
D.
Basel–Biel/Bienne railway line
The Basel–Biel/Bienne railway line is a major Swiss rail route connecting the city of Basel with Biel/Bienne, serving as an important corridor for both regional and long-distance passenger and freight traffic.
-
E.
Zürich–Sargans railway
The Zürich–Sargans railway is a major Swiss rail line connecting the city of Zürich with the eastern Swiss town of Sargans, forming part of an important national and international transit corridor.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2454f1348819088d83f420925a5c1 |
completed | April 17, 2026, 2:35 p.m. |
| NER | Named-entity recognition | batch_69f1790998fc8190962e21a28dd08d29 |
completed | April 29, 2026, 3:20 a.m. |
Created at: April 17, 2026, 3:18 p.m.