Triple

T2270394
Position Surface form Disambiguated ID Type / Status
Subject Nueva Planta decrees in Mallorca E50643 entity
Predicate instanceOf P0 FINISHED
Object Bourbon reform C9301 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Bourbon reform
Context triple: [Nueva Planta decrees in Mallorca, instanceOf, Bourbon reform]
  • A. Napoleonic policy
    Napoleonic policy refers to the strategic, administrative, legal, and military measures implemented by Napoleon Bonaparte to centralize authority, modernize state institutions, expand French influence, and consolidate his personal rule across Europe.
  • B. Ottoman reform movement
    The Ottoman reform movement was a series of 19th- and early 20th-century state-led initiatives aimed at modernizing the empire’s military, administration, legal system, and society to strengthen central authority and respond to internal and external pressures.
  • C. Reconstruction-era legislation
    Reconstruction-era legislation comprises the post–Civil War laws and constitutional amendments enacted between 1865 and 1877 to abolish slavery, define citizenship, protect civil rights, and restructure political power in the former Confederate states.
  • D. Intolerable Act
    An Intolerable Act is a severe and oppressive measure or policy perceived as unjust and unacceptable, often provoking strong resistance or demands for change.
  • E. coup d'état
    A coup d'état is a sudden, often illegal and forceful seizure of state power by a small group, typically involving elements of the military or political elite, that removes the existing government without fundamentally altering the broader constitutional or social order.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88b05910c8190a9a2b1ff230c85f9 completed March 4, 2026, 7:41 p.m.
Created at: March 4, 2026, 7:48 p.m.