Triple

T22697940
Position Surface form Disambiguated ID Type / Status
Subject Muskö naval base E561235 entity
Predicate connectedBy P37 FINISHED
Object Muskö Tunnel NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Muskö Tunnel | Statement: [Muskö naval base, connectedBy, Muskö Tunnel]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Muskö Tunnel
Context triple: [Muskö naval base, connectedBy, Muskö Tunnel]
  • A. Muskö Tunnel chosen
    Muskö Tunnel is a Swedish underwater road tunnel connecting the island of Muskö to the mainland, notable for serving the strategic Muskö naval base.
  • B. Gravhals Tunnel
    Gravhals Tunnel is a railway tunnel on Norway’s Bergensbanen line, carrying trains through mountainous terrain between Eastern and Western Norway.
  • C. Eiksund Tunnel
    The Eiksund Tunnel is a deep undersea road tunnel in western Norway that links islands in Møre og Romsdal county to the mainland as part of the regional highway network.
  • D. Fredhällstunneln
    Fredhällstunneln is a road tunnel in Stockholm, Sweden, that carries part of the Essingeleden section of the European route E4/E20 motorway.
  • E. Vallavik Tunnel
    Vallavik Tunnel is a road tunnel in western Norway that forms part of the regional highway network connecting to the Hardanger Bridge.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2454e615481909c177440be559d2c completed April 17, 2026, 2:35 p.m.
NER Named-entity recognition batch_69f178a008448190b393335704128fe8 completed April 29, 2026, 3:18 a.m.
Created at: April 17, 2026, 3:14 p.m.