Triple
T22687609
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Anand Vihar Terminal |
E560958
|
entity |
| Predicate | adjacentTo |
P224
|
FINISHED |
| Object | Anand Vihar ISBT |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Anand Vihar ISBT | Statement: [Anand Vihar Terminal, adjacentTo, Anand Vihar ISBT]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Anand Vihar ISBT Context triple: [Anand Vihar Terminal, adjacentTo, Anand Vihar ISBT]
-
A.
Anand Vihar Terminal
Anand Vihar Terminal is a major railway station and transport hub in East Delhi, serving as a key terminus for long-distance and suburban trains connecting the National Capital Region with cities across northern India.
-
B.
Anand Vihar metro station
Anand Vihar metro station is an interchange station in East Delhi that connects the Delhi Metro network with the major Anand Vihar railway and interstate bus terminals, serving as a key regional transit hub.
-
C.
Pt. Deen Dayal Upadhyaya Junction
Pt. Deen Dayal Upadhyaya Junction is a major railway junction and transit hub in Uttar Pradesh, India, serving as an important stop on the Delhi–Howrah main line.
-
D.
Rajendra Nagar Terminal
Rajendra Nagar Terminal is a major railway terminus in Patna, Bihar, serving as an important hub for long-distance and regional train services in eastern India.
-
E.
Jamia Millia Islamia metro station
Jamia Millia Islamia metro station is a station on the Delhi Metro network serving the Jamia Millia Islamia University area and the surrounding Okhla locality in South East Delhi.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Anand Vihar ISBT Target entity description: Anand Vihar ISBT is a major interstate bus terminal in East Delhi serving long-distance and regional bus services for the National Capital Region and neighboring states.
-
A.
Anand Vihar Terminal
Anand Vihar Terminal is a major railway station and transport hub in East Delhi, serving as a key terminus for long-distance and suburban trains connecting the National Capital Region with cities across northern India.
-
B.
Anand Vihar metro station
chosen
Anand Vihar metro station is an interchange station in East Delhi that connects the Delhi Metro network with the major Anand Vihar railway and interstate bus terminals, serving as a key regional transit hub.
-
C.
Pt. Deen Dayal Upadhyaya Junction
Pt. Deen Dayal Upadhyaya Junction is a major railway junction and transit hub in Uttar Pradesh, India, serving as an important stop on the Delhi–Howrah main line.
-
D.
Rajendra Nagar Terminal
Rajendra Nagar Terminal is a major railway terminus in Patna, Bihar, serving as an important hub for long-distance and regional train services in eastern India.
-
E.
Jamia Millia Islamia metro station
Jamia Millia Islamia metro station is a station on the Delhi Metro network serving the Jamia Millia Islamia University area and the surrounding Okhla locality in South East Delhi.
- F. None of above.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2454d71b48190a1f80af9f82b6fcf |
completed | April 17, 2026, 2:35 p.m. |
| NER | Named-entity recognition | batch_69f178983fc8819080aa00e45ff77952 |
completed | April 29, 2026, 3:18 a.m. |
Created at: April 17, 2026, 3:13 p.m.