Triple
T2267312
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Moscow Central Diameters |
E50176
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public transport network component |
C911
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public transport network component Context triple: [Moscow Central Diameters, instanceOf, public transport network component]
-
A.
transportation network company
A transportation network company is a business that uses digital platforms, typically mobile apps, to connect passengers with drivers who provide on-demand transportation services.
-
B.
public transportation infrastructure
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
C.
public transit system
chosen
A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
-
D.
transport infrastructure network
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
-
E.
transport infrastructure operator
A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88b01e0048190ba96431b5f990ba9 |
completed | March 4, 2026, 7:41 p.m. |
Created at: March 4, 2026, 7:48 p.m.