Triple
T22651509
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mattamuskeet National Wildlife Refuge |
E559104
|
entity |
| Predicate | centeredOn |
P164
|
FINISHED |
| Object | Lake Mattamuskeet |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lake Mattamuskeet | Statement: [Mattamuskeet National Wildlife Refuge, centeredOn, Lake Mattamuskeet]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Lake Mattamuskeet Context triple: [Mattamuskeet National Wildlife Refuge, centeredOn, Lake Mattamuskeet]
-
A.
Lake Mattamuskeet
chosen
Lake Mattamuskeet is the largest natural lake in North Carolina, renowned for its shallow waters, rich wetlands, and importance as a habitat for migratory waterfowl.
-
B.
Lake Morris
Lake Morris is a freshwater lake located in Dartmouth, Nova Scotia, Canada.
-
C.
Roanoke Rapids Lake
Roanoke Rapids Lake is a man-made reservoir on the Roanoke River in North Carolina, primarily used for hydroelectric power generation, recreation, and flood control.
-
D.
Jordan Lake
Jordan Lake is a large man-made reservoir in central North Carolina known for recreation, wildlife habitat, and regional water supply and flood control.
-
E.
Jordan Lake
Jordan Lake is a man-made reservoir in Elmore County, Alabama, used primarily for hydroelectric power generation, recreation, and water management.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245489dd88190b1f674acf61c8769 |
completed | April 17, 2026, 2:35 p.m. |
| NER | Named-entity recognition | batch_69f1703c5538819089d9b5349f26ea6d |
completed | April 29, 2026, 2:43 a.m. |
Created at: April 17, 2026, 3:06 p.m.