Triple

T22649802
Position Surface form Disambiguated ID Type / Status
Subject Meta Open Source team E559062 entity
Predicate instanceOf P0 FINISHED
Object software engineering team C8686 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: software engineering team
Context triple: [Meta Open Source team, instanceOf, software engineering team]
  • A. software development team chosen
    A software development team is a collaborative group of professionals with complementary technical and organizational skills who work together to design, build, test, and maintain software products or systems.
  • B. software engineering organization
    A software engineering organization is a structured group of people, processes, and tools dedicated to designing, building, testing, deploying, and maintaining software systems to meet specific business or user needs.
  • C. software engineering program
    A software engineering program is a structured course of study that teaches the principles, methods, and tools for designing, developing, testing, and maintaining reliable and efficient software systems.
  • D. software engineer
    A software engineer is a professional who designs, develops, tests, and maintains software systems by applying principles of computer science and engineering to solve real-world problems.
  • E. software development program
    A software development program is an organized set of tools, processes, and educational or operational components designed to plan, create, test, and maintain software applications efficiently and reliably.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245489dd88190b1f674acf61c8769 completed April 17, 2026, 2:35 p.m.
Created at: April 17, 2026, 3:05 p.m.