Triple

T22649464
Position Surface form Disambiguated ID Type / Status
Subject Expo E559055 entity
Predicate instanceOf P0 FINISHED
Object React Native framework C8316 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: React Native framework
Context triple: [Expo, instanceOf, React Native framework]
  • A. cross-platform development framework
    A cross-platform development framework is a software toolkit that enables developers to build applications that run on multiple operating systems or devices from a single shared codebase.
  • B. cross-platform UI framework chosen
    A cross-platform UI framework is a software toolkit that enables developers to build user interfaces once and deploy them across multiple operating systems and devices with minimal platform-specific changes.
  • C. UI framework
    A UI framework is a collection of tools, libraries, and components that provide a structured way to build, style, and manage user interfaces for applications.
  • D. mobile software framework
    A mobile software framework is a reusable set of libraries, tools, and APIs that provides a structured foundation for building, deploying, and maintaining applications on mobile operating systems.
  • E. reactive programming framework
    A reactive programming framework is a software toolkit that enables building applications by modeling data and events as asynchronous streams, automatically propagating changes through declarative dataflow relationships.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245489dd88190b1f674acf61c8769 completed April 17, 2026, 2:35 p.m.
Created at: April 17, 2026, 3:05 p.m.