Triple

T22639737
Position Surface form Disambiguated ID Type / Status
Subject Otago Region E558789 entity
Predicate hasRiver P165 FINISHED
Object Taieri River NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Taieri River | Statement: [Otago Region, hasRiver, Taieri River]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Taieri River
Context triple: [Otago Region, hasRiver, Taieri River]
  • A. Taieri River chosen
    The Taieri River is one of the major rivers in New Zealand’s South Island, flowing through rural Otago before reaching the Pacific Ocean.
  • B. Kali River
    The Kali River is a significant west-flowing river in the Indian state of Karnataka, known for passing by the coastal town of Karwar before emptying into the Arabian Sea.
  • C. Kali River
    Kali River is a Himalayan river flowing through India and Nepal, known for its hydropower projects, irrigation importance, and role as part of the India–Nepal border.
  • D. Kat River
    The Kat River is a river in South Africa’s Eastern Cape that flows through the Fort Beaufort area and forms part of the region’s agricultural and historical landscape.
  • E. Tooma River
    The Tooma River is a snow-fed river in the Snowy Mountains of New South Wales, Australia, that forms part of the Snowy Mountains Scheme’s network of diverted alpine waterways.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24547f7fc819086e2c4ba3b979657 completed April 17, 2026, 2:35 p.m.
NER Named-entity recognition batch_69f17010aa4c8190a9f0cf7eb4c066cd completed April 29, 2026, 2:42 a.m.
Created at: April 17, 2026, 3:04 p.m.