Triple

T22609492
Position Surface form Disambiguated ID Type / Status
Subject TASS E566661 entity
Predicate instanceOf P0 FINISHED
Object tilting train authorization and speed supervision system C3558 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: tilting train authorization and speed supervision system
Context triple: [TASS, instanceOf, tilting train authorization and speed supervision system]
  • A. train control system chosen
    A train control system is a coordinated set of hardware and software components that monitor, regulate, and automate train movements to ensure safe, efficient, and reliable railway operations.
  • B. high-speed test train
    A high-speed test train is a specialized railway vehicle designed to operate at very high velocities to evaluate, validate, and optimize track infrastructure, signaling systems, and rolling stock performance under extreme operating conditions.
  • C. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • D. rail vehicle
    A rail vehicle is a wheeled conveyance designed to operate on railway tracks for transporting passengers, freight, or performing specialized rail-related tasks.
  • E. railway signaling system
    A railway signaling system is an integrated set of trackside and onboard equipment, rules, and communication protocols that control train movements to ensure safe separation, efficient routing, and protection against collisions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245884860819081046ce07d5872c4 completed April 17, 2026, 2:36 p.m.
Created at: April 17, 2026, 2:56 p.m.