Triple
T22563571
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Trakia motorway A1 |
E557881
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object | Pan-European transport corridor |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pan-European transport corridor | Statement: [Trakia motorway A1, partOf, Pan-European transport corridor]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Pan-European transport corridor Context triple: [Trakia motorway A1, partOf, Pan-European transport corridor]
-
A.
Trans-European transport corridor
The Trans-European transport corridor is a major pan-European network of road, rail, and other transport routes designed to improve connectivity, trade, and mobility across multiple European countries.
-
B.
Pan-European Transport Corridor IX
Pan-European Transport Corridor IX is a major trans-European transport route connecting northern and southern Europe, facilitating trade and mobility across multiple countries including Greece and Bulgaria.
-
C.
east–west European transport corridor
The east–west European transport corridor is a major transcontinental route facilitating road and other transport links between Western and Eastern Europe.
-
D.
north–south European transport corridor
The north–south European transport corridor is a major trans-European route facilitating long-distance movement of people and goods between northern and southern Europe.
-
E.
Pan-European Corridor III
Pan-European Corridor III is a major trans-European transport route linking Western and Eastern Europe, running from Germany through Poland and Ukraine toward Eastern markets.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Pan-European transport corridor Target entity description: The Pan-European transport corridor is a major transnational route network designated to improve connectivity and trade across multiple European countries by integrating key road, rail, and other transport links.
-
A.
Trans-European transport corridor
chosen
The Trans-European transport corridor is a major pan-European network of road, rail, and other transport routes designed to improve connectivity, trade, and mobility across multiple European countries.
-
B.
Pan-European Transport Corridor IX
Pan-European Transport Corridor IX is a major trans-European transport route connecting northern and southern Europe, facilitating trade and mobility across multiple countries including Greece and Bulgaria.
-
C.
east–west European transport corridor
The east–west European transport corridor is a major transcontinental route facilitating road and other transport links between Western and Eastern Europe.
-
D.
north–south European transport corridor
The north–south European transport corridor is a major trans-European route facilitating long-distance movement of people and goods between northern and southern Europe.
-
E.
Pan-European Corridor III
Pan-European Corridor III is a major trans-European transport route linking Western and Eastern Europe, running from Germany through Poland and Ukraine toward Eastern markets.
- F. None of above.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e5ae4ac8190b1f503457603d969 |
completed | April 16, 2026, 5:37 p.m. |
| NER | Named-entity recognition | batch_69f15fa7a828819096804ac928e2aaf9 |
completed | April 29, 2026, 1:32 a.m. |
Created at: April 16, 2026, 8:52 p.m.