Triple

T22544976
Position Surface form Disambiguated ID Type / Status
Subject Nantahala Mountains E557395 entity
Predicate contains P35 FINISHED
Object Tellico Gap NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tellico Gap | Statement: [Nantahala Mountains, contains, Tellico Gap]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tellico Gap
Context triple: [Nantahala Mountains, contains, Tellico Gap]
  • A. Watauga Gap
    Watauga Gap is a mountain pass in the Appalachian region that provides a natural crossing point along the border between Tennessee and North Carolina.
  • B. Harpeth Narrows
    Harpeth Narrows is a scenic, narrow gorge along the Harpeth River in Tennessee known for its striking rock formations, historic tunnel, and popular hiking and paddling opportunities.
  • C. Newfound Gap
    Newfound Gap is a high mountain pass and scenic overlook on the Tennessee–North Carolina border, renowned for its panoramic views and as a major access point within Great Smoky Mountains National Park.
  • D. Nolichucky Dam
    Nolichucky Dam is a hydroelectric and flood-control dam on the Nolichucky River in Tennessee, known for forming Davy Crockett Lake and supporting regional power generation and recreation.
  • E. Chickamauga Dam
    Chickamauga Dam is a Tennessee Valley Authority hydroelectric dam and navigation lock structure near Chattanooga, Tennessee, that helps generate power, control flooding, and improve river transportation on the Tennessee River.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Tellico Gap
Target entity description: Tellico Gap is a mountain pass in the Nantahala National Forest of western North Carolina, commonly used as a crossing and access point along the Appalachian Trail.
  • A. Watauga Gap
    Watauga Gap is a mountain pass in the Appalachian region that provides a natural crossing point along the border between Tennessee and North Carolina.
  • B. Harpeth Narrows
    Harpeth Narrows is a scenic, narrow gorge along the Harpeth River in Tennessee known for its striking rock formations, historic tunnel, and popular hiking and paddling opportunities.
  • C. Newfound Gap
    Newfound Gap is a high mountain pass and scenic overlook on the Tennessee–North Carolina border, renowned for its panoramic views and as a major access point within Great Smoky Mountains National Park.
  • D. Nolichucky Dam
    Nolichucky Dam is a hydroelectric and flood-control dam on the Nolichucky River in Tennessee, known for forming Davy Crockett Lake and supporting regional power generation and recreation.
  • E. Chickamauga Dam
    Chickamauga Dam is a Tennessee Valley Authority hydroelectric dam and navigation lock structure near Chattanooga, Tennessee, that helps generate power, control flooding, and improve river transportation on the Tennessee River.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e58662081909ae346ab384514ca completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f15f34a0688190ad55be067db8e21b completed April 29, 2026, 1:30 a.m.
Created at: April 16, 2026, 8:51 p.m.