Triple

T2254022
Position Surface form Disambiguated ID Type / Status
Subject M73 motorway E49678 entity
Predicate hasJunctionWith P1018 FINISHED
Object A8 road E62801 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A8 road | Statement: [M73 motorway, hasJunctionWith, A8 road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A8 road
Context triple: [M73 motorway, hasJunctionWith, A8 road]
  • A. A8 road chosen
    The A8 road is a major route in the United Kingdom that connects Glasgow to Greenock in western Scotland, serving as an important link for regional and local traffic.
  • B. A80 road
    The A80 road is a major route in Scotland that historically connected Glasgow to Stirling and the north before being largely replaced by the M80 motorway.
  • C. A82 road
    The A82 road is a major Scottish trunk route running from Glasgow to Inverness through the Highlands, including the scenic western shore of Loch Lomond.
  • D. A81 road
    The A81 road is a major route in central Scotland that runs between Glasgow and Callander, passing through towns and villages such as Aberfoyle and providing access to the Trossachs area.
  • E. A9 road
    The A9 road is a major Scottish trunk route running from Falkirk to Scrabster, forming the main north–south artery through the Highlands.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88aaa9250819095e127d0d77e8a32 completed March 4, 2026, 7:40 p.m.
NER Named-entity recognition batch_69abc12029548190af9f2cdd7a4de2d6 completed March 7, 2026, 6:09 a.m.
NED1 Entity disambiguation (via context triple) batch_69c70ad71194819081361abadfc256ca completed March 27, 2026, 10:55 p.m.
Created at: March 4, 2026, 7:47 p.m.