Triple

T22528890
Position Surface form Disambiguated ID Type / Status
Subject Kastraki Dam E556977 entity
Predicate upstreamFrom P5955 FINISHED
Object Stratos Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Stratos Dam | Statement: [Kastraki Dam, upstreamFrom, Stratos Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Stratos Dam
Context triple: [Kastraki Dam, upstreamFrom, Stratos Dam]
  • A. Stratos Dam chosen
    Stratos Dam is a major hydroelectric dam in western Greece that harnesses the Acheloos River for power generation and water management.
  • B. Polyphytos Dam
    Polyphytos Dam is a major hydroelectric dam on the Aliakmon River in northern Greece, forming the Polyphytos Reservoir and contributing significantly to the country’s power generation and water management.
  • C. Tavropos Dam
    Tavropos Dam is a hydroelectric and irrigation dam in central Greece whose construction led to the formation of Lake Plastiras, a major regional water reservoir and tourist attraction.
  • D. Emmarentia Dam
    Emmarentia Dam is a popular recreational reservoir and parkland in Johannesburg, South Africa, known for its scenic green spaces, walking trails, and proximity to the Johannesburg Botanical Garden.
  • E. Ladon Dam
    Ladon Dam is a hydroelectric and water management structure built on the Ladon River in Greece.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e57483c8190b0887c4f8ff26446 completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f15ed4d4608190ba93bb54f15334a5 completed April 29, 2026, 1:28 a.m.
Created at: April 16, 2026, 8:51 p.m.