Triple

T22482697
Position Surface form Disambiguated ID Type / Status
Subject Chengdu Metro Line 2 E555804 entity
Predicate interchangeWith P3495 FINISHED
Object Chengdu Metro Line 9 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Chengdu Metro Line 9 | Statement: [Chengdu Metro Line 2, interchangeWith, Chengdu Metro Line 9]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Chengdu Metro Line 9
Context triple: [Chengdu Metro Line 2, interchangeWith, Chengdu Metro Line 9]
  • A. Chengdu Metro Line 8
    Chengdu Metro Line 8 is a rapid transit line in Chengdu’s metro system that serves as part of the city’s expanding urban rail network and connects multiple key districts.
  • B. Chengdu Metro Line 10
    Chengdu Metro Line 10 is a rapid transit line in Chengdu, China, that notably connects the city center with Chengdu Shuangliu International Airport and serves as part of the city's expanding urban rail network.
  • C. Chengdu Metro Line 7
    Chengdu Metro Line 7 is a circular rapid transit line forming an orbital route around central Chengdu, connecting multiple radial metro lines and key urban districts.
  • D. Chengdu Metro Line 5
    Chengdu Metro Line 5 is a major north–south rapid transit line in Chengdu’s metro system, designed to enhance cross-city connectivity and relieve congestion on parallel routes.
  • E. Chengdu Metro Line 2
    Chengdu Metro Line 2 is a major east–west rapid transit line in Chengdu’s metro system, connecting key commercial, residential, and transport hubs across the city.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Chengdu Metro Line 9
Target entity description: Chengdu Metro Line 9 is a fully automated circular rapid transit line in Chengdu, China, designed to connect multiple radial metro lines and facilitate transfers around the city.
  • A. Chengdu Metro Line 8
    Chengdu Metro Line 8 is a rapid transit line in Chengdu’s metro system that serves as part of the city’s expanding urban rail network and connects multiple key districts.
  • B. Chengdu Metro Line 10
    Chengdu Metro Line 10 is a rapid transit line in Chengdu, China, that notably connects the city center with Chengdu Shuangliu International Airport and serves as part of the city's expanding urban rail network.
  • C. Chengdu Metro Line 7
    Chengdu Metro Line 7 is a circular rapid transit line forming an orbital route around central Chengdu, connecting multiple radial metro lines and key urban districts.
  • D. Chengdu Metro Line 5
    Chengdu Metro Line 5 is a major north–south rapid transit line in Chengdu’s metro system, designed to enhance cross-city connectivity and relieve congestion on parallel routes.
  • E. Chengdu Metro Line 2
    Chengdu Metro Line 2 is a major east–west rapid transit line in Chengdu’s metro system, connecting key commercial, residential, and transport hubs across the city.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e53897c819088863779f8c50bb0 completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f15c3a3b688190b41599979d038d85 completed April 29, 2026, 1:17 a.m.
Created at: April 16, 2026, 8:49 p.m.