Triple

T2248088
Position Surface form Disambiguated ID Type / Status
Subject Air Route Traffic Control Center E49552 entity
Predicate instanceOf P0 FINISHED
Object air traffic control facility C3808 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: air traffic control facility
Context triple: [Air Route Traffic Control Center, instanceOf, air traffic control facility]
  • A. air navigation organization chosen
    An air navigation organization is an entity responsible for planning, managing, and controlling the safe and efficient movement of aircraft through designated airspace using air traffic services, communication, navigation, and surveillance systems.
  • B. airport system
    An airport system is an integrated network of facilities, services, and processes that manages the safe, efficient movement of passengers, cargo, and aircraft within and around an airport.
  • C. airfield
    An airfield is a designated area of land equipped with runways, taxiways, and minimal support facilities for the takeoff, landing, and ground movement of aircraft.
  • D. airport authority
    An airport authority is an organization responsible for the ownership, management, operation, and regulation of an airport or group of airports, ensuring safe, efficient, and compliant aviation services and facilities.
  • E. aviation authority
    An aviation authority is a governmental or regulatory body responsible for overseeing civil aviation safety, security, standards, and compliance within a specific jurisdiction.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88aa979788190ad6500f1d8eee2fc completed March 4, 2026, 7:40 p.m.
Created at: March 4, 2026, 7:47 p.m.