Triple

T22469349
Position Surface form Disambiguated ID Type / Status
Subject Minakami E555451 entity
Predicate hasDam P8736 FINISHED
Object Fujiwara Dam NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Fujiwara Dam | Statement: [Minakami, hasDam, Fujiwara Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Fujiwara Dam
Context triple: [Minakami, hasDam, Fujiwara Dam]
  • A. Yahagi Dam
    Yahagi Dam is a major multipurpose dam in Japan used for flood control, water supply, and hydroelectric power generation.
  • B. Kindaruma Dam
    Kindaruma Dam is one of Kenya’s major hydroelectric power stations on the Tana River, contributing significantly to the country’s electricity generation.
  • C. Nagayasuguchi Dam
    Nagayasuguchi Dam is a hydroelectric dam located on Japan’s Yoshino River, used primarily for power generation and flood control.
  • D. Hoheikyo Dam
    Hoheikyo Dam is a concrete arch dam in the mountainous outskirts of Sapporo, Japan, known for its scenic reservoir, autumn foliage, and nearby hot spring resorts.
  • E. Ukai Dam
    Ukai Dam is a major multi-purpose reservoir and hydroelectric dam in Gujarat, India, built on the Tapi River for irrigation, power generation, and flood control.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Fujiwara Dam
Target entity description: Fujiwara Dam is a hydroelectric and flood-control dam located in the mountainous town of Minakami in Gunma Prefecture, Japan.
  • A. Yahagi Dam
    Yahagi Dam is a major multipurpose dam in Japan used for flood control, water supply, and hydroelectric power generation.
  • B. Kindaruma Dam
    Kindaruma Dam is one of Kenya’s major hydroelectric power stations on the Tana River, contributing significantly to the country’s electricity generation.
  • C. Nagayasuguchi Dam
    Nagayasuguchi Dam is a hydroelectric dam located on Japan’s Yoshino River, used primarily for power generation and flood control.
  • D. Hoheikyo Dam
    Hoheikyo Dam is a concrete arch dam in the mountainous outskirts of Sapporo, Japan, known for its scenic reservoir, autumn foliage, and nearby hot spring resorts.
  • E. Ukai Dam
    Ukai Dam is a major multi-purpose reservoir and hydroelectric dam in Gujarat, India, built on the Tapi River for irrigation, power generation, and flood control.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e52c2048190952dc5df209b9bed completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f15bdeae9c8190a5b66e540484db37 completed April 29, 2026, 1:16 a.m.
Created at: April 16, 2026, 8:48 p.m.