Triple

T22445898
Position Surface form Disambiguated ID Type / Status
Subject Dart team E554861 entity
Predicate instanceOf P0 FINISHED
Object Google team C14963 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Google team
Context triple: [Dart team, instanceOf, Google team]
  • A. Google employee
    A Google employee is an individual hired by Google to contribute to the development, operation, or support of the company’s products, services, and internal functions within its organizational structure.
  • B. Google X project
    A Google X project is an experimental, high-risk, high-reward initiative within Alphabet’s research lab focused on developing breakthrough technologies that could have massive, long-term societal impact.
  • C. organizational unit at Google chosen
    An organizational unit at Google is a logical grouping of users, devices, and resources within the company’s directory structure used to apply and manage specific policies, settings, and access controls.
  • D. Google office
    A Google office is a modern, collaborative workspace designed by Google that combines advanced technology, flexible work areas, and employee-focused amenities to foster innovation and productivity.
  • E. Google developer product
    A Google developer product is a tool, platform, or service provided by Google that enables software developers to build, test, deploy, and optimize applications or integrations within the Google ecosystem or on the open web.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e5113208190ab58c6b595f9d1d0 completed April 16, 2026, 5:37 p.m.
Created at: April 16, 2026, 8:47 p.m.