Triple

T22440331
Position Surface form Disambiguated ID Type / Status
Subject 東御苑 E554736 entity
Predicate 主な出入口 P107201 FINISHED
Object 北桔橋門 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 北桔橋門 | Statement: [東御苑, 主な出入口, 北桔橋門]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: 北桔橋門
Context triple: [東御苑, 主な出入口, 北桔橋門]
  • A. 北桔橋門 chosen
    北桔橋門は、江戸城跡の一部として整備された皇居東御苑の北側に位置する歴史的な城門です。
  • B. 渡月橋
    渡月橋は、京都市嵐山の桂川に架かる景勝地として知られる歴史的な木造風観光橋です。
  • C. 台北橋
    台北橋 is a major bridge in northern Taiwan that spans the Tamsui River, connecting Taipei City with New Taipei City and serving as an important commuter route.
  • D. 生口橋
    生口橋 is a cable-stayed road bridge in Japan that forms part of the Shimanami Kaidō route connecting the islands of Honshu and Shikoku.
  • E. 復興橋
    復興橋 is a bridge in Taipei, Taiwan, commonly known as Fuxing Bridge, that serves as an important local traffic connection.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e5010e48190ae1e9c9db9697637 completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f15ae0edcc8190919b198035de0df2 completed April 29, 2026, 1:12 a.m.
Created at: April 16, 2026, 8:47 p.m.