Triple

T2242269
Position Surface form Disambiguated ID Type / Status
Subject M-28 E49422 entity
Predicate connectsTo P845 FINISHED
Object I-75 E34949 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: I-75 | Statement: [M-28, connectsTo, I-75]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: I-75
Context triple: [M-28, connectsTo, I-75]
  • A. Interstate 75 chosen
    Interstate 75 is a major north–south U.S. Interstate Highway running from southern Florida through several states in the Midwest to the Canadian border in Michigan.
  • B. Interstate 96
    Interstate 96 is a major east–west freeway in Michigan that connects the state capital Lansing with the Detroit metropolitan area and other key cities.
  • C. Interstate 65
    Interstate 65 is a major north–south U.S. highway running through the central United States, connecting the Gulf Coast to the Midwest and serving key cities such as Mobile, Birmingham, Nashville, and Indianapolis.
  • D. Interstate 94
    Interstate 94 is a major east–west U.S. Interstate Highway running from Montana to Michigan, serving key Midwestern cities such as Minneapolis–Saint Paul, Milwaukee, and Chicago.
  • E. Interstate 76
    Interstate 76 is a major east–west U.S. highway composed of two separate segments in Colorado–Nebraska and Pennsylvania–New Jersey, serving as a key route through the central and northeastern United States.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88aa979788190ad6500f1d8eee2fc completed March 4, 2026, 7:40 p.m.
NER Named-entity recognition batch_69abc0c017548190a71fb4a0e2a8189f completed March 7, 2026, 6:08 a.m.
NED1 Entity disambiguation (via context triple) batch_69c7eea9112c8190b0f0040afbf916ce completed March 28, 2026, 3:07 p.m.
Created at: March 4, 2026, 7:47 p.m.