Triple

T22422274
Position Surface form Disambiguated ID Type / Status
Subject Franco-British union proposal of June 1940 E554277 entity
Predicate instanceOf P0 FINISHED
Object unrealized political project C15944 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: unrealized political project
Context triple: [Franco-British union proposal of June 1940, instanceOf, unrealized political project]
  • A. political project chosen
    A political project is a coordinated set of ideas, goals, and actions aimed at transforming or preserving power relations, institutions, or public policies within a political community.
  • B. unreleased operating system project
    An unreleased operating system project is a not-yet-public software platform under development that manages hardware resources and provides core services for running applications.
  • C. unbuilt aircraft project
    An unbuilt aircraft project is a conceptual or proposed airplane design that was planned and possibly studied or partially developed but never constructed or flown.
  • D. unfinished building project
    An unfinished building project is a partially constructed structure where work has been halted before completion, leaving it unusable for its intended purpose.
  • E. African Union project
    An African Union project is a coordinated initiative undertaken by the African Union and its member states to advance continental priorities such as peace, integration, development, and governance across Africa.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e4f2d0c819091aa3558ea2ee630 completed April 16, 2026, 5:37 p.m.
Created at: April 16, 2026, 8:47 p.m.