Triple
T22415656
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Indonesian National Transportation Safety Committee |
E554117
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transport safety authority |
C3074
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transport safety authority Context triple: [Indonesian National Transportation Safety Committee, instanceOf, transport safety authority]
-
A.
public transit safety oversight agency
A public transit safety oversight agency is a governmental or quasi-governmental body responsible for setting, monitoring, and enforcing safety standards and practices across public transportation systems to protect passengers, workers, and the public.
-
B.
transportation safety agency
chosen
A transportation safety agency is an organization responsible for regulating, monitoring, and enforcing safety standards across transportation systems to prevent accidents and protect the public.
-
C.
rail safety regulator
A rail safety regulator is an authority responsible for setting, monitoring, and enforcing safety standards and practices across railway systems to protect passengers, workers, and the public.
-
D.
transport ministry
The transport ministry is a government department responsible for planning, regulating, and overseeing a nation’s transportation systems and infrastructure, including roads, railways, air, and maritime transport.
-
E.
transportation organization
A transportation organization is an entity that plans, manages, and operates systems or services that move people or goods from one location to another.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e4e6ce8819085a1e06d886bf21c |
completed | April 16, 2026, 5:37 p.m. |
Created at: April 16, 2026, 8:46 p.m.