Triple

T22405583
Position Surface form Disambiguated ID Type / Status
Subject Carpentras railway station E553871 entity
Predicate railwayLine P848 FINISHED
Object Carpentras–Avignon railway NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Carpentras–Avignon railway | Statement: [Carpentras railway station, railwayLine, Carpentras–Avignon railway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Carpentras–Avignon railway
Context triple: [Carpentras railway station, railwayLine, Carpentras–Avignon railway]
  • A. Marseille–Aix-en-Provence railway
    The Marseille–Aix-en-Provence railway is a regional rail line in southern France that connects the port city of Marseille with the inland city of Aix-en-Provence.
  • B. Tarascon–Sète railway
    The Tarascon–Sète railway is a French rail line in southern France that connects the Rhône valley to the Mediterranean coast, serving several important regional cities and ports.
  • C. Saint-Germain-des-Fossés–Nîmes railway
    The Saint-Germain-des-Fossés–Nîmes railway is a major French rail line that links central France to the Mediterranean region, serving numerous towns and cities along its north–south route.
  • D. Béziers–Neussargues railway
    The Béziers–Neussargues railway is a French rail line crossing the Massif Central, noted for its dramatic mountain scenery and engineering works such as the Garabit Viaduct.
  • E. Marseille–Miramas–Salon–Avignon line
    The Marseille–Miramas–Salon–Avignon line is a regional railway route in southern France that connects Marseille with inland towns including Miramas, Salon-de-Provence, and Avignon.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Carpentras–Avignon railway
Target entity description: The Carpentras–Avignon railway is a regional rail line in southeastern France that connects the town of Carpentras with the city of Avignon.
  • A. Marseille–Aix-en-Provence railway
    The Marseille–Aix-en-Provence railway is a regional rail line in southern France that connects the port city of Marseille with the inland city of Aix-en-Provence.
  • B. Tarascon–Sète railway
    The Tarascon–Sète railway is a French rail line in southern France that connects the Rhône valley to the Mediterranean coast, serving several important regional cities and ports.
  • C. Saint-Germain-des-Fossés–Nîmes railway
    The Saint-Germain-des-Fossés–Nîmes railway is a major French rail line that links central France to the Mediterranean region, serving numerous towns and cities along its north–south route.
  • D. Béziers–Neussargues railway
    The Béziers–Neussargues railway is a French rail line crossing the Massif Central, noted for its dramatic mountain scenery and engineering works such as the Garabit Viaduct.
  • E. Marseille–Miramas–Salon–Avignon line
    The Marseille–Miramas–Salon–Avignon line is a regional railway route in southern France that connects Marseille with inland towns including Miramas, Salon-de-Provence, and Avignon.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e4da7048190b4387d422a9a0de5 completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f158b739b88190a7f1f20fd1e9b188 completed April 29, 2026, 1:02 a.m.
Created at: April 16, 2026, 8:46 p.m.