Triple
T22387050
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Zope Component Architecture |
E553421
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Zope technology |
C30823
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Zope technology Context triple: [Zope Component Architecture, instanceOf, Zope technology]
-
A.
Solaris technology
Solaris technology is an advanced, sun-derived energy and systems framework that harnesses solar radiation through innovative materials, architectures, and control algorithms to power sustainable infrastructure and intelligent devices.
-
B.
Web technology suite
chosen
A web technology suite is an integrated collection of tools, frameworks, and protocols used to design, develop, deploy, and manage web applications and services.
-
C.
Mozilla project
The Mozilla project is an open-source initiative focused on developing web technologies, applications, and standards that promote an open, accessible, and user-centric internet.
-
D.
W3C software project
A W3C software project is an open, collaboratively developed software initiative under the World Wide Web Consortium that implements, tests, or supports W3C web standards and technologies.
-
E.
pylon
A pylon is a tall, vertical support structure, often made of steel or concrete, used to carry power lines, support bridges, or mark entrances and boundaries.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e4cf87c8190a1ff474daec326b7 |
completed | April 16, 2026, 5:37 p.m. |
Created at: April 16, 2026, 8:45 p.m.