Triple
T22380940
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Burroughs MCP |
E553270
|
entity |
| Predicate | alsoKnownAs |
P39
|
FINISHED |
| Object | MCP |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: MCP | Statement: [Burroughs MCP, alsoKnownAs, MCP]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: MCP Context triple: [Burroughs MCP, alsoKnownAs, MCP]
-
A.
MCP
chosen
MCP (Master Control Program) is a mainframe operating system developed by Burroughs (later Unisys) known for its early and rigorous implementation of features like stack-based architecture, high-level language orientation, and strong security and reliability.
-
B.
MCP
MCP is a U.S. Marine Corps commissioning pathway that allows outstanding enlisted Marines to become commissioned officers.
-
C.
MCP
MCP is a comprehensive regulatory framework in Massachusetts that governs the assessment and cleanup of contaminated sites to protect public health and the environment.
-
D.
MCP series
The MCP series is a line of Motorola VMEbus-based computer systems designed for embedded and industrial computing applications.
-
E.
MPC
MPC is the commonly used abbreviation for the Monetary Policy Committee, the body responsible for setting key interest rates and guiding monetary policy in several countries, including the United Kingdom.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e4c03248190a26a5060ea6973ee |
completed | April 16, 2026, 5:37 p.m. |
| NER | Named-entity recognition | batch_69f1582c05fc8190836ae008426177a5 |
completed | April 29, 2026, 1 a.m. |
Created at: April 16, 2026, 8:45 p.m.