Triple

T22380669
Position Surface form Disambiguated ID Type / Status
Subject Calgary International Airport terminal projects E553263 entity
Predicate instanceOf P0 FINISHED
Object airport terminal expansion program C44526 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: airport terminal expansion program
Context triple: [Calgary International Airport terminal projects, instanceOf, airport terminal expansion program]
  • A. airport infrastructure project chosen
    An airport infrastructure project is a coordinated set of planning, design, construction, and upgrade activities aimed at developing or improving airport facilities, systems, and services to support safe, efficient air transportation.
  • B. airport infrastructure funding program
    An airport infrastructure funding program is a structured initiative that allocates financial resources to plan, build, upgrade, and maintain airport facilities and related systems to ensure safe, efficient, and sustainable air transportation operations.
  • C. airport system
    An airport system is an integrated network of facilities, services, and processes that manages the safe, efficient movement of passengers, cargo, and aircraft within and around an airport.
  • D. airport-related building
    A building located on or near an airport that supports air travel operations, such as terminals, control towers, hangars, or maintenance facilities.
  • E. Airport
    An airport is a complex transportation hub where aircraft take off, land, are serviced, and passengers and cargo transition between air and ground travel through various terminals and support facilities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e4c03248190a26a5060ea6973ee completed April 16, 2026, 5:37 p.m.
Created at: April 16, 2026, 8:45 p.m.