Triple
T22373797
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Vite |
E553105
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | frontend tooling |
C15486
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: frontend tooling Context triple: [Vite, instanceOf, frontend tooling]
-
A.
front-end build tool
A front-end build tool is a software utility that automates tasks like bundling, transpiling, optimizing, and managing assets for client-side web applications.
-
B.
developer tool
chosen
A developer tool is a software application or utility designed to help programmers create, test, debug, and maintain code more efficiently.
-
C.
JavaScript module bundler
A JavaScript module bundler is a tool that analyzes, transforms, and combines multiple JavaScript (and related asset) modules into optimized bundles for efficient loading in web or other runtime environments.
-
D.
prototyping tool
A prototyping tool is a software application or platform that enables users to quickly create, visualize, and test interactive mockups or early versions of products, interfaces, or systems before full-scale development.
-
E.
collection of programming tools
A collection of programming tools is an organized set of software utilities, libraries, and environments designed to assist developers in writing, testing, debugging, and maintaining code efficiently.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e4c03248190a26a5060ea6973ee |
completed | April 16, 2026, 5:37 p.m. |
Created at: April 16, 2026, 8:45 p.m.