Triple

T22351277
Position Surface form Disambiguated ID Type / Status
Subject Ferbane E552535 entity
Predicate servedByRoad P385 FINISHED
Object N62 road NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: N62 road | Statement: [Ferbane, servedByRoad, N62 road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: N62 road
Context triple: [Ferbane, servedByRoad, N62 road]
  • A. N62 road chosen
    The N62 road is a national secondary route in Ireland that runs through the Midlands, connecting the towns of Athlone and Horse and Jockey while linking several major regional roads and motorways.
  • B. N61 road
    The N61 road is a national secondary route in Ireland that runs through the Midlands and west of the country, linking towns such as Athlone and Roscommon.
  • C. N60 road
    The N60 road is a national secondary route in western Ireland that connects the towns of Castlebar and Roscommon, serving as an important regional link in County Mayo and surrounding areas.
  • D. N65 road
    The N65 road is a major Dutch highway in the province of North Brabant that connects the cities of Vught and Tilburg and serves several towns in between.
  • E. N69 road
    The N69 road is a national secondary route in southwest Ireland that connects Limerick to Tralee, serving towns along the Shannon Estuary.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e4a0ad08190a385b4d343cf6524 completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f1579be6d8819088fed70f54ff4e66 completed April 29, 2026, 12:58 a.m.
Created at: April 16, 2026, 8:44 p.m.