Triple

T2234439
Position Surface form Disambiguated ID Type / Status
Subject Interstate 77 E49245 entity
Predicate maintainedBy P86 FINISHED
Object North Carolina Department of Transportation
The North Carolina Department of Transportation is the state government agency responsible for planning, building, and maintaining North Carolina’s transportation infrastructure, including highways, public transit, rail, and aviation systems.
E251439 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: North Carolina Department of Transportation | Statement: [Interstate 77, maintainedBy, North Carolina Department of Transportation]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: North Carolina Department of Transportation
Context triple: [Interstate 77, maintainedBy, North Carolina Department of Transportation]
  • A. South Carolina Department of Transportation
    The South Carolina Department of Transportation is the state agency responsible for planning, building, and maintaining South Carolina’s highway and transportation infrastructure.
  • B. Georgia Department of Transportation
    The Georgia Department of Transportation is the state agency responsible for planning, constructing, and maintaining Georgia’s transportation infrastructure, including highways, bridges, and public transit systems.
  • C. Arkansas Department of Transportation
    The Arkansas Department of Transportation is the state government agency responsible for planning, building, and maintaining Arkansas’s highway and transportation infrastructure.
  • D. Tennessee Department of Transportation
    The Tennessee Department of Transportation is the state agency responsible for planning, building, and maintaining Tennessee’s highway and transportation infrastructure.
  • E. Virginia Department of Transportation
    The Virginia Department of Transportation is the state agency responsible for planning, building, and maintaining Virginia’s highway system and other transportation infrastructure.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: North Carolina Department of Transportation
Triple: [Interstate 77, maintainedBy, North Carolina Department of Transportation]
Generated description
The North Carolina Department of Transportation is the state government agency responsible for planning, building, and maintaining North Carolina’s transportation infrastructure, including highways, public transit, rail, and aviation systems.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: North Carolina Department of Transportation
Target entity description: The North Carolina Department of Transportation is the state government agency responsible for planning, building, and maintaining North Carolina’s transportation infrastructure, including highways, public transit, rail, and aviation systems.
  • A. South Carolina Department of Transportation
    The South Carolina Department of Transportation is the state agency responsible for planning, building, and maintaining South Carolina’s highway and transportation infrastructure.
  • B. Georgia Department of Transportation
    The Georgia Department of Transportation is the state agency responsible for planning, constructing, and maintaining Georgia’s transportation infrastructure, including highways, bridges, and public transit systems.
  • C. Arkansas Department of Transportation
    The Arkansas Department of Transportation is the state government agency responsible for planning, building, and maintaining Arkansas’s highway and transportation infrastructure.
  • D. Tennessee Department of Transportation
    The Tennessee Department of Transportation is the state agency responsible for planning, building, and maintaining Tennessee’s highway and transportation infrastructure.
  • E. Virginia Department of Transportation
    The Virginia Department of Transportation is the state agency responsible for planning, building, and maintaining Virginia’s highway system and other transportation infrastructure.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88aa84bdc819086df50e9c20b301e completed March 4, 2026, 7:40 p.m.
NER Named-entity recognition batch_69abc09297a481909e8fe6ec645de616 completed March 7, 2026, 6:07 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae71bd294c8190b46fc4ad69cb7c37 completed March 9, 2026, 7:07 a.m.
NEDg Description generation batch_69ae728e46608190b4192519c705bc32 completed March 9, 2026, 7:11 a.m.
NED2 Entity disambiguation (via description) batch_69ae72ff572081909b7c4aebb9e26180 completed March 9, 2026, 7:13 a.m.
Created at: March 4, 2026, 7:47 p.m.