Triple

T2233281
Position Surface form Disambiguated ID Type / Status
Subject Edinburgh Trams E49220 entity
Predicate instanceOf P0 FINISHED
Object tramway C910 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: tramway
Context triple: [Edinburgh Trams, instanceOf, tramway]
  • A. rail transit
    Rail transit is a public transportation system that moves passengers or freight along fixed steel tracks using trains, subways, trams, or light rail vehicles, typically in urban or intercity corridors.
  • B. subway line
    A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
  • C. streetcar system chosen
    A streetcar system is an urban public transit network that operates rail vehicles on fixed tracks, typically embedded in city streets, to transport passengers along defined routes.
  • D. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • E. elevated railway
    An elevated railway is a rail transport system in which tracks and stations are built on raised structures above ground level, typically supported by columns or girders, to avoid interference with street traffic.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88aa84bdc819086df50e9c20b301e completed March 4, 2026, 7:40 p.m.
Created at: March 4, 2026, 7:47 p.m.