Triple
T22309054
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rio Tietê |
E551463
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object | Promissão Dam |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Promissão Dam | Statement: [Rio Tietê, hasDam, Promissão Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Promissão Dam Context triple: [Rio Tietê, hasDam, Promissão Dam]
-
A.
Promissão Dam
chosen
Promissão Dam is a hydroelectric and water management structure located on the Tietê River in the state of São Paulo, Brazil.
-
B.
Riveiro
Riveiro is a surname variant of Ribeiro, a common Portuguese and Galician family name.
-
C.
Endako River
Endako River is a tributary waterway in central British Columbia, Canada, that feeds into the Nechako River within the Fraser River basin.
-
D.
Elsa River
The Elsa River is a watercourse in Tuscany, central Italy, that flows through towns such as Certaldo before joining the Arno River.
-
E.
Salto River
The Salto River is a waterway that serves as the primary outflow from Lake Salto, contributing to the regional river system and surrounding ecosystems.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e46c0188190800181a4233f28fe |
completed | April 16, 2026, 5:37 p.m. |
| NER | Named-entity recognition | batch_69f1574c8a248190bf5eef5be78381fd |
completed | April 29, 2026, 12:56 a.m. |
Created at: April 16, 2026, 8:42 p.m.