Triple
T22290886
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Isle of Eigg community |
E550990
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | renewable energy community |
C20093
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: renewable energy community Context triple: [Isle of Eigg community, instanceOf, renewable energy community]
-
A.
community energy project
chosen
A community energy project is a locally initiated and collectively governed initiative that develops, owns, or manages energy generation, efficiency, or storage systems to meet shared social, environmental, and economic goals.
-
B.
renewable energy power station
A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
-
C.
eco-village
An eco-village is a planned community designed to minimize environmental impact by integrating sustainable housing, renewable energy, local food production, and cooperative social structures.
-
D.
renewable energy developer
A renewable energy developer is an entity or professional that identifies, plans, finances, and constructs projects that generate power from sustainable sources such as solar, wind, hydro, or geothermal energy.
-
E.
community
A community is a group of people connected by shared location, interests, values, or identity who interact and support one another over time.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e45fb848190a1b2ae21296e3a5f |
completed | April 16, 2026, 5:37 p.m. |
Created at: April 16, 2026, 8:41 p.m.