Triple

T22290886
Position Surface form Disambiguated ID Type / Status
Subject Isle of Eigg community E550990 entity
Predicate instanceOf P0 FINISHED
Object renewable energy community C20093 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: renewable energy community
Context triple: [Isle of Eigg community, instanceOf, renewable energy community]
  • A. community energy project chosen
    A community energy project is a locally initiated and collectively governed initiative that develops, owns, or manages energy generation, efficiency, or storage systems to meet shared social, environmental, and economic goals.
  • B. renewable energy power station
    A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
  • C. eco-village
    An eco-village is a planned community designed to minimize environmental impact by integrating sustainable housing, renewable energy, local food production, and cooperative social structures.
  • D. renewable energy developer
    A renewable energy developer is an entity or professional that identifies, plans, finances, and constructs projects that generate power from sustainable sources such as solar, wind, hydro, or geothermal energy.
  • E. community
    A community is a group of people connected by shared location, interests, values, or identity who interact and support one another over time.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e45fb848190a1b2ae21296e3a5f completed April 16, 2026, 5:37 p.m.
Created at: April 16, 2026, 8:41 p.m.