Triple

T22287103
Position Surface form Disambiguated ID Type / Status
Subject Peugeot J5 E550891 entity
Predicate assemblyPlant P4859 FINISHED
Object Sevel Sud plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sevel Sud plant | Statement: [Peugeot J5, assemblyPlant, Sevel Sud plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Sevel Sud plant
Context triple: [Peugeot J5, assemblyPlant, Sevel Sud plant]
  • A. K-27 plant
    The K-27 plant was a major uranium enrichment facility at the Oak Ridge site that used gaseous diffusion technology as part of the U.S. nuclear weapons and energy programs.
  • B. Sormovo Plant
    Sormovo Plant, now known as the Krasnoye Sormovo Factory, is one of Russia’s oldest and most significant industrial enterprises, historically renowned for building ships, submarines, and heavy machinery.
  • C. Asan plant
    The Asan plant is a major Hyundai Motor Company automobile manufacturing facility located in Asan, South Korea.
  • D. Plant No. 23
    Plant No. 23 was a major Soviet-era aerospace manufacturing facility that later became known as the Khrunichev State Research and Production Space Center, a key producer of launch vehicles and space technology.
  • E. Oji Plant
    Oji Plant is a production facility of Japan’s National Printing Bureau, primarily involved in manufacturing official printed materials such as currency and government documents.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Sevel Sud plant
Target entity description: The Sevel Sud plant is a major automotive manufacturing facility in Italy operated by Stellantis (formerly Fiat and PSA) that produces light commercial vehicles for multiple brands.
  • A. K-27 plant
    The K-27 plant was a major uranium enrichment facility at the Oak Ridge site that used gaseous diffusion technology as part of the U.S. nuclear weapons and energy programs.
  • B. Sormovo Plant
    Sormovo Plant, now known as the Krasnoye Sormovo Factory, is one of Russia’s oldest and most significant industrial enterprises, historically renowned for building ships, submarines, and heavy machinery.
  • C. Asan plant
    The Asan plant is a major Hyundai Motor Company automobile manufacturing facility located in Asan, South Korea.
  • D. Plant No. 23
    Plant No. 23 was a major Soviet-era aerospace manufacturing facility that later became known as the Khrunichev State Research and Production Space Center, a key producer of launch vehicles and space technology.
  • E. Oji Plant
    Oji Plant is a production facility of Japan’s National Printing Bureau, primarily involved in manufacturing official printed materials such as currency and government documents.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e44d538819097c6b8f333af3352 completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f1560896348190985725ac8ad406b3 completed April 29, 2026, 12:51 a.m.
Created at: April 16, 2026, 8:40 p.m.