Triple
T22281924
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Havre–Caumartin |
E550753
|
entity |
| Predicate | hasConnection |
P8776
|
FINISHED |
| Object | RER A at Auber |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: RER A at Auber | Statement: [Havre–Caumartin, hasConnection, RER A at Auber]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: RER A at Auber Context triple: [Havre–Caumartin, hasConnection, RER A at Auber]
-
A.
RER A at La Défense
RER A at La Défense is a major Paris regional express rail line station serving the La Défense business district and acting as a key interchange between suburban, metro, and tramway services.
-
B.
RER A at Châtelet–Les Halles
RER A at Châtelet–Les Halles is a major Paris regional express rail line serving one of the city’s largest and busiest underground transport hubs, providing high-capacity connections between central Paris and its suburbs.
-
C.
RER A terminus
RER A terminus is the endpoint station of Paris’s RER A commuter rail line, where trains start or finish their routes.
-
D.
RER C at Pont de l’Alma
RER C at Pont de l’Alma is a station on Paris’s RER Line C serving the area near the Pont de l’Alma and the Seine in the 7th arrondissement.
-
E.
RER E at Bondy
RER E at Bondy is a station on Paris’s RER Line E serving the eastern suburbs and providing regional rail connections toward central Paris.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: RER A at Auber Target entity description: RER A at Auber is a major underground commuter rail station in central Paris that forms part of the busy RER A line, providing extensive regional and suburban connections beneath the city’s main shopping and business districts.
-
A.
RER A at La Défense
RER A at La Défense is a major Paris regional express rail line station serving the La Défense business district and acting as a key interchange between suburban, metro, and tramway services.
-
B.
RER A at Châtelet–Les Halles
RER A at Châtelet–Les Halles is a major Paris regional express rail line serving one of the city’s largest and busiest underground transport hubs, providing high-capacity connections between central Paris and its suburbs.
-
C.
RER A terminus
RER A terminus is the endpoint station of Paris’s RER A commuter rail line, where trains start or finish their routes.
-
D.
RER C at Pont de l’Alma
RER C at Pont de l’Alma is a station on Paris’s RER Line C serving the area near the Pont de l’Alma and the Seine in the 7th arrondissement.
-
E.
RER E at Bondy
RER E at Bondy is a station on Paris’s RER Line E serving the eastern suburbs and providing regional rail connections toward central Paris.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e44d538819097c6b8f333af3352 |
completed | April 16, 2026, 5:37 p.m. |
| NER | Named-entity recognition | batch_69f14eac0994819088e39a1b5d39cf18 |
completed | April 29, 2026, 12:19 a.m. |
Created at: April 16, 2026, 8:40 p.m.